The failures we get called to fix
Almost every rotted subfloor, stained ceiling below a bathroom and black mould behind a shower wall traces back to the same handful of shortcuts: cement board treated as if it were a membrane, a pan that does not slope to the drain, unsealed corners and pipe penetrations, or a mortar bed with no vapour management at all.
None of these show up in the first year. They show up in year five, and by then the repair is a demolition rather than a fix.
How we build a shower
Bonded waterproofing as a continuous system: sheet or liquid membrane across walls and pan, reinforced band at every inside corner and change of plane, sealed collars at mixing valve and shower head penetrations, and a bonding flange drain the membrane actually ties into.
The pan is sloped to the drain before waterproofing, not after, at the slope the drain manufacturer specifies. Curbless entries and linear drains get a recessed subfloor and a single-plane slope so the floor drains without a lip to step over.
Flood tested, then tiled
Before a single tile is set, the drain is plugged and the pan is filled and held. A flood test either passes or it does not, and it is far cheaper to find out at that stage than after the walls are finished.
Waterproofing that will be inspected gets photographed at each stage, so you have documentation of what is behind your tile long after it is closed up.